Sector 03
WATER RESOURCE
(US$ mill.)
Project ID Title Foreign Exchange Cost Local Cost Total Cost
980362 Drainage Pumping Rehabilitation Project in DKI Jakarta Stage III 8.40 3.60 12.00
980360 Maintenance Equipment for Large Canals and Wetlands Systems 51.00 4.00 55.00
980357 Ciliwung-Cisadane Flood Control Project Phase II 51.00 77.00 128.00
980356 Lower Solo Water Resources Development Project II(a) 71.00 106.00 177.00
970522 Panti Rao Irrigation Development Project 8.00 12.00 20.00
970521 Kali Garang Flood Control and Semarang Urban Drainage Project 62.00 92.00 154.00
970505 Southern Sumatra Integrated Swamp Development 33.00 132.00 165.00
970283 Project Type Sector Loan II (PTSL II) for Irrigation and Water Resources Development 78.80 118.20 197.00
963076 Komering Irrigation Project Stage-2 Phase II 29.00 44.00 73.00
950756 Construction of Irrigation Networks in Nusa Tenggara and Maluku 65.00 135.00 200.00
950643 Construction of Jatigede Multipurpose Dam (Stage I) 120.00 180.00 300.00
940584 Maloso Irrigation Project II 12.00 8.00 20.00
Total 589.20 911.80 1501.00